Serving Tuscaloosa, Northport, Cottondale, Coker, Vance & nearby West Alabama townsCall (205) 656-5328
Concrete Contractors in Tuscaloosa, AL

Replacements, widening & aprons

Concrete Driveways in Tuscaloosa, AL

A driveway that stays flat on West Alabama clay and sends storm water to the street, not the garage.

  • Free on-site measuring visit
  • Written, line-by-line quote before any work
  • Base, thickness and curing planned for clay soil and summer heat

Driveways That Stay Level

Concrete driveways in Tuscaloosa usually fail from below. The surface rarely wears out first. Instead, the clay underneath swells after weeks of rain and shrinks in a dry spell, runoff from the roof or yard softens one corner, and a panel by the garage or at the street drops or tips. Once a panel moves, the cracks widen every season and the driveway starts holding puddles.

Signs it is time for a new driveway

  • Several panels have sunk or tilted, especially at the garage door or the apron
  • Cracks have opened wide enough that one side sits higher than the other
  • Water pools on the driveway or runs back toward the house
  • The surface has worn through to loose stone across large areas
  • The edges along the yard are broken off
  • It is too narrow for the cars and trucks you park now

One sunken panel on an otherwise solid driveway can often be lifted, and that is covered on our repair page. When settling, wide cracks and drainage problems all show up at once, replacement usually costs less over time than patching.

What goes under the concrete

We break out the old driveway, whether it is concrete, asphalt or gravel, and dig out soft or organic soil. Crushed stone goes in and is compacted in layers to give the slab firm, even support that does not hold water against it. Forms are set so the finished surface falls toward the street or a side yard, never toward the garage floor or the foundation.

Thickness depends on what parks there. HomeGuide's driveway guide says a residential driveway should be at least 4 inches thick for standard vehicles, 5 to 6 inches for RVs and heavy traffic, with edges of 6 to 8 inches. If you park a work truck, a boat trailer or a camper, we thicken that area. Rebar set in the middle of the slab holds cracked sections together so they do not separate and shift.

Drainage is half the job

Tuscaloosa averages about 53.5 inches of rain a year, according to Wikipedia's climate table, and much of it comes in heavy storms. Before forming, we look at where your downspouts empty, where the yard sheds water and where the street gutter sits. Sometimes the fix is as simple as extending a downspout past the slab. Sometimes it means adding a trench drain at the garage or reshaping the ground beside the driveway. Either way it is settled before the concrete arrives.

Get a Free Estimate

The apron and the street

The last few feet of most driveways, the apron and any public sidewalk it crosses, usually sit in the street right-of-way. The City of Tuscaloosa's Office of the City Engineer lists right-of-way permits among its applications, and the city's permit page says permits are required for new construction and alterations. We confirm what your address needs, in the city, Northport or the county, and handle the timing.

Finish choices

  • Broom finish: the standard. Fine ridges give grip in rain.
  • Exposed aggregate: the top paste washed away to show the stone, which hides tire marks.
  • Stamped or colored borders: a decorative band along the edges while the main lanes stay plain.
  • Smooth trowel: neat looking but slick when wet, so we keep it off sloped driveways.

Caring for a new driveway

Keep cars off for at least seven days. HomeGuide recommends waiting about 30 days for heavy vehicles and 28 to 30 days before the first coat of sealer, then resealing every 2 to 3 years. Keep downspouts discharging away from the edges, and fill small cracks early so water cannot get under the slab.

What a Driveway Quote Includes

Each part of the job is listed separately so you can see where the money goes.

Tear-out and haul-off

Old concrete, asphalt or gravel broken out and removed, along with soft soil below.

Compacted stone base

Crushed stone placed and compacted in layers for firm, draining support.

Grading and drainage

Forms set to slope away from the house, with downspouts or drains handled first.

Reinforcement

Rebar placed mid-slab, sized for the driveway and the vehicles on it.

Pour, finish and joints

Concrete placed, broom finished and jointed on a planned layout.

Widening and parking pads

Extra lanes, turnarounds and side pads tied into the existing driveway.

Stamped Concrete in Tuscaloosa, AL

Typical Concrete Driveway Costs

ItemPublished range
Standard driveway, per sq ft installed$6 to $10
One-car, 10 x 20 ft$1,200 to $3,000
Two-car, 20 x 20 ft$2,400 to $6,000
Two-car, 24 x 24 ft$3,500 to $8,600
Three-car, 24 x 36 ft$5,200 to $13,000
Old driveway removal, per sq ft$2 to $6
Grading, per sq ft$3 to $8
Sealing, per sq ft$1 to $3

Figures from HomeGuide's concrete driveway cost guide (national averages, standard to basic concrete). Tuscaloosa prices can run higher or lower, and removal, grading, thickness and finish all change the total. The written estimate after we measure is your price.

Start to Finish

1. Site visit

We measure, check drainage and the apron, and give you a written quote.

2. Demolition and base

Old driveway removed, soft soil dug out, stone base compacted.

3. Pour

Forms, rebar, concrete, broom finish and control joints, early in the day in summer.

4. Cure and handoff

Written dates for walking, driving and sealing.

Sidewalks & Steps in Tuscaloosa, AL

Why Choose Us for Concrete Driveways

Thickness where it counts

Extra depth at the apron and wherever trucks or trailers sit.

Water handled first

Downspouts and runoff sorted out before the concrete goes in.

Concrete Driveways Questions

How long does a concrete driveway last?

HomeGuide's guide gives 30 to 40 years for a well-built, maintained driveway. Around Tuscaloosa, the base and the drainage around the slab decide most of where yours falls in that range.

How thick should my driveway be?

HomeGuide says at least 4 inches for standard vehicles and 5 to 6 inches for RVs and heavy traffic, with thicker edges. We add depth where heavy vehicles park and at the apron.

Can you pour over my old driveway?

We rarely recommend it. New concrete over a cracked, settled driveway picks up the same cracks and raises the surface at the garage and the street. Taking out the old slab and fixing the base is the dependable route.

Do I need a permit for a new driveway in Tuscaloosa?

The city requires permits for new construction and alterations, and work at the street can need a right-of-way permit from the Office of the City Engineer at (205) 248-5380. We check the rules for your address, including Northport and county addresses.

When can I park on it?

HomeGuide recommends at least 7 days for cars and about 30 days for heavy vehicles. We give you exact dates for your driveway.

Concrete Slabs in Tuscaloosa, AL

Get a Concrete Driveways Estimate

We measure your driveway and price it in writing, in Tuscaloosa and nearby towns.

Call Now: (205) 656-5328